Official recordLaw No. 54/2015 - Extension of Temporary Generation-Permit Authority
Legal characterExtension of temporary licensing authority
Current readingExpired
Historic extension of the Law 288 permit window.
Why it matters
The time-limited measure supported early renewable licensing while the institutional architecture in Law 462 remained incomplete.
Core provisions
The operative ideas to understand before reading the full text.
- 01
Extended the interim route created by Law 288.
- 02
Maintained Cabinet-level authority for an additional two years.
- 03
Kept the exceptional licensing channel available while the permanent regulator was absent.
Engineering lens
- Preserved the route used for early renewable permits.
- No technical compliance requirement is inferred beyond the permit itself.
Economic and investment lens
- Extended the window for project negotiation and PPA development.
- Expiry is a material title and bankability issue.
From text to operation
Implementation gates
These conditions must be evidenced before treating the instrument as operational for a project, tariff or market transaction.
- 1Valid approval during the extension period
- 2Project permits, PPA and grid connection
- 3Ongoing validity checked under later law
Documented relationships
- This instrument extends temporary authority Law 288
- Linked instrument uses the temporary permit route Wind licences
Primary sources
- Parliamentary proceedings on the extension of Law 288/2014 Lebanese Parliament · Published · Arabic · Accessed 16 August 2026
- National Renewable Energy Action Plan 2025-2030 Lebanese Center for Energy Conservation · Published · English · Accessed 16 August 2026
- Call for proposals for approximately 200 MW of wind power Ministry of Energy and Water / Lebanese Center for Energy Conservation · Published · English · Accessed 16 August 2026Official procurement record noting Cabinet approval of permits for three wind farms; approval is not evidence of commissioning.