Litani basin water management and hydroelectric generation.
Why it matters
Its water-management decisions, three-plant hydro cascade and rehabilitation programme connect hydrology, dam safety, renewable output and grid adequacy.
Core provisions
The operative ideas to understand before reading the full text.
- 01
Develops and operates Litani water-resource and electricity assets.
- 02
Operates the Qaraoun system and a cascade of three hydropower plants.
- 03
Balances electricity generation with irrigation, water supply, dam safety and environmental responsibilities.
Engineering lens
- Operates Qaraoun Dam and Markabi, Awali and Joun plants.
- Hydropower output couples plant condition, reservoir and irrigation constraints.
Economic and investment lens
- Rehabilitation can restore low-fuel-cost renewable production.
- Benefits depend on water opportunity cost, availability and grid absorption.
From text to operation
Implementation gates
These conditions must be evidenced before treating the instrument as operational for a project, tariff or market transaction.
- 1Dam safety and water operations
- 2Plant rehabilitation and controls
- 3Availability and generation reporting
Documented relationships
- Linked instrument funds hydropower rehabilitation by LRESRP
- This instrument provides the hydropower operating base for NREAP 2025-2030
Primary sources
- National Litani River Authority - statutory objectives and mandate Litani River Authority · Publication date not stated · English · Accessed 16 August 2026
- LRA hydropower rehabilitation under the Renewable Energy and System Reinforcement Project Litani River Authority · Published · English · Accessed 16 August 2026
- Lebanon Renewable Energy and System Reinforcement Project World Bank · Published · English · Accessed 16 August 2026
- National Renewable Energy Action Plan 2025-2030 Lebanese Center for Energy Conservation · Published · English · Accessed 16 August 2026